|
Unlimited Tutoring & Homework Help
|
Construction
It consists of N turns of coil PQRS wound over a non-magnetic metallic frame usually rectangular or circular. The coil is suspended from a torsion head H by means of phosphor bronze strip in a magnetic pole by pieces N and S. A mirror M is attached to the phosphor bronze strip. The other end of th..
Construction
The biogas plant is a brick and cement structure having the following five sections: Mixing tank present above the ground level. Inlet chamber: The mixing tank opens underground into a sloping inlet chamber. Digester: The inlet chamber opens from below into the digester which is ..
The biogas plant is a brick and cement structure having the following five sections: Mixing tank present above the ground level. Inlet chamber: The mixing tank opens underground into a sloping inlet chamber. Digester: The inlet chamber opens from below into the digester which is ..Construction
Leclanche cell of an outer glass vessel which is filled with saturated ammonium chloride (NH 4 Cl) solution. In it there stands a zinc rod and porous pot 'P' containing a carbon rod 'c' which is packed round with a mixture of manganese dioxide (MnO 2 ) and powdered carbon. Wet Leclanche Cell T..
Leclanche cell of an outer glass vessel which is filled with saturated ammonium chloride (NH 4 Cl) solution. In it there stands a zinc rod and porous pot 'P' containing a carbon rod 'c' which is packed round with a mixture of manganese dioxide (MnO 2 ) and powdered carbon. Wet Leclanche Cell T..Construction
The figure below shows the construction of an electric motor. The main parts of an electric motor are: D.C. Motor the armature coil ABCD mounted on an axle the commutator that is a split ring divided in two parts S 1 and S 2 a pair of brushes B 1 and B 2 a horse - shoe electromagnet The c..
The figure below shows the construction of an electric motor. The main parts of an electric motor are: D.C. Motor the armature coil ABCD mounted on an axle the commutator that is a split ring divided in two parts S 1 and S 2 a pair of brushes B 1 and B 2 a horse - shoe electromagnet The c..Construction
. A sharp image of the object is focused on the film by adjusting the distance of the lens from the film. There is a focusing ring, which turns over a scale engraved on the lens. By means of this ring, the distance between the lens and the film can be adjusted by moving the lens forward and backwar..
Construction - 5
To construct angles of 75 o and 105 o (i) Draw AB. Make any point O on it. (ii) With O as centre, draw an arc which cuts AB at B. (iii) With B as centre and same radius, cut an arc at Q and from Q with same radius, cut the arc at R. (iv) Join OQ, OR. and (v) Bisect by constructing..
To construct angles of 75 o and 105 o (i) Draw AB. Make any point O on it. (ii) With O as centre, draw an arc which cuts AB at B. (iii) With B as centre and same radius, cut an arc at Q and from Q with same radius, cut the arc at R. (iv) Join OQ, OR. and (v) Bisect by constructing..Co-terminal Angles
Co-terminal Angles - The angles (2 p + A), (4 p + A)......have the same initial and terminal arm as the angle A and so these angles are called co-terminal angles . For all such angles, the value of any trigonometric ratio is the same. Thus, all co-terminal an..
Co-terminal Angles - The angles (2 p + A), (4 p + A)......have the same initial and terminal arm as the angle A and so these angles are called co-terminal angles . For all such angles, the value of any trigonometric ratio is the same. Thus, all co-terminal an..Construction and Working
Water flowing in high altitude rivers is stored in a man-made reservoir as shown in the figure. The kinetic energy of the flowing water is transformed into potential energy as the water level rises. This water is carried through pipes to the turbine situated at the bottom of the dam. The water ..
Water flowing in high altitude rivers is stored in a man-made reservoir as shown in the figure. The kinetic energy of the flowing water is transformed into potential energy as the water level rises. This water is carried through pipes to the turbine situated at the bottom of the dam. The water ..Construction - 15
To construct a triangle when the sum of two sides, the remaining side and the angle between them are given (We assume that the given angle can be constructed with ruler and compass alone) In BC = 3.8 cm, and AB + AC = 6.5 cm (1) Draw BC = 3.8 cm and at B make (2) With ..
To construct a triangle when the sum of two sides, the remaining side and the angle between them are given (We assume that the given angle can be constructed with ruler and compass alone) In BC = 3.8 cm, and AB + AC = 6.5 cm (1) Draw BC = 3.8 cm and at B make (2) With .. Result
Pages   :     1     2     3     4     5     6     7     8     9     10     11
See what our Users say :
I got a great help from tutors for my entrance test for math and English. Thank you so much
I am Jessica from New York, I got excellent English tutors from Tutor Vista, who helped me lot to overcome my grammar mistakes, Thanks a lot...
I got a very good score in GED because of your great tutors, Thank you Tutor Vista - Pam
Chemistry is a tough subject for me, I get a great help here along with a detailed explanation from a virtual tutor, it's really amazing - Nancy


..